Our members:
Nuclear Basics
Information Library
The WNA
Members Login
Home
›
Information Library
›
Nuclear Database
Basic Search
|
Advanced Search
|
Return To Results
Gravelines-4, France
Overview
CURRENT STATUS
Operable
DETAILS
Reactor Type
Commercial Reactor
Process
PWR
Vendor
Framatome
Owner
Electricite De France
Model
CP1
Operator
Electricite De France
Capacity Net
910 MWe
Capacity Gross
951 MWe
Capacity Thermal
2785 MWt
CONSTRUCTION AND OPERATION
Start Construction
1 April 1976
Criticality
31 May 1981
Grid Connection
14 June 1981
Commercial Operation
1 October 1981
OPERATING PERFORMANCE
Output Life
189.23 TWh
Capacity Factor Life
75.6 %
The Gravelines nuclear power plant in France. [Image: Areva]