Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | HPR1000 |
| Owner | Guangxi Fangchenggang Nuclear Power Company, Ltd. |
| Operator | Guangxi Fangchenggang Nuclear Power Company, Ltd. |
Timeline
| Construction Start | Friday, 23 December 2016 |
|---|---|
| First Criticality | Wednesday, 3 April 2024 |
| First Grid Connection | Tuesday, 9 April 2024 |
| Commercial Operation | Saturday, 25 May 2024 |
Specifications
| Capacity Net | 1105 MWe |
|---|---|
| Capacity Gross | 1188 MWe |
| Thermal Capacity | 3150 MWt |
| Design Net Capacity | 1105 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2024 | 1000 | 5100 | 5216.64 | 96.20 | 96.20 | 96.20 | 98.10 | 98.10 |