Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | EPR |
| Owner | EDF |
| Operator | EDF |
Timeline
| Construction Start | Monday, 3 December 2007 |
|---|---|
| First Criticality | Tuesday, 3 September 2024 |
| First Grid Connection | Saturday, 21 December 2024 |
| Commercial Operation |
Specifications
| Capacity Net | 1630 MWe |
|---|---|
| Capacity Gross | 1650 MWe |
| Thermal Capacity | 4300 MWt |
| Design Net Capacity | 1620 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2024 | 1630 | 0 | 0.00 | - | - | - | - | - |