Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | AP1000 |
| Owner | Georgia Power Co. |
| Operator | Southern Nuclear Operating Company, Inc. |
Timeline
| Construction Start | Saturday, 2 March 2013 |
|---|---|
| First Criticality | Monday, 6 March 2023 |
| First Grid Connection | Saturday, 1 April 2023 |
| Commercial Operation | Monday, 31 July 2023 |
Specifications
| Capacity Net | 1117 MWe |
|---|---|
| Capacity Gross | 1250 MWe |
| Thermal Capacity | 3400 MWt |
| Design Net Capacity | 1117 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2023 | 1117 | 6625 | 7369.67 | 100.00 | 100.00 | 100.00 | 99.30 | 99.30 |
| 2024 | 1117 | 7127 | 7679.43 | 81.10 | 81.20 | 86.70 | 78.30 | 84.50 |