| Table 1: The main technical data for the EPR design | |||
| Basic design | Basic design optimisation phase |
||
| Rated thermal power (NSSS) | MW | 4272 | 4925 |
| Rated electrical power (gross) | MW | 1609 | 1850 |
| house load | MW | ~80 | ~100 |
| Reactor coolant system: | |||
| number of loops | 4 | 4 | |
| operating pressure | barabs | 155 | 155 |
| RPV inlet/outlet temperature | °C | 291.3/326.3 | 292.5/330 |
| total flow rate | kg/s | 21050 | 22240 |
| Main steam pressure at full load | barabs | 72.5 | 74.6 |
| Main steam pressure at hot standby | barabs | 84 | 86 |
| Core: | |||
| number of fuel assemblies | 241 | 241 | |
| number of control rod assemblies | 89 | 89 | |
| fuel assembly array | 17x17-25 | 17x17-25 | |
| active height | cm | 420 | 420 |
| average linear heat rate | W/cm | 155 | 178 |
| max. enrichment | % U235 | 5 | 5 |
| Total inventory of fuel | Mg | 141 | 141 |
| Batch discharge burnup | MWd/kg | 60 | 60 |
Reactor Refurbishment and the Development of Improved Designs:Restore Frames | Sym Home | Programme | Back
| Forward
© copyright The Uranium Institute 1998