Table 2: Production plan for the Dornod uranium project

 
 Production
 
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 Total 

Tonnes mined   538 000   700 000   1 050 000   1 050 000   1 050 000   750 000   350 000   350 000   350 000   350 000   95 328   6 633 328
Contained tU @ 0.192% grade   613 940 1 729 1 729 1 729 1 446 1 068 1 068 1 068 1 068 261 12 722
 
Years of production 0.5 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.4 9.9
 
Mine #2 stockpile
Tonnes to pad 238 000 0   238 000
   • Head grade (%U) 0.071% 0.071%   0.071%
   • Recovery (%U) 77.0% 77.0%   77.0%
   • Recoverable tU 39.0 91.1   130
   • Recoverable lbs U3O8 101 489 236 809   338 298
 
Mine #2 open pit
Tonnes to pad 300 000 700 000 700 000 700 000 700 000 400 000 0   3 500 000
   • Head grade (%U) 0.148% 0.134% 0.094% 0.094% 0.094% 0.094% 0.094%   0.107%
   • Recovery (%U) 77.0% 77.0% 77.0% 77.0% 77.0% 77.0% 77.0%   77.0%
   • Recoverable tU 102.7 601.7 616.5 508.8 508.8 399.8 145.4   2 884
   • Recoverable lbs U3O8 266 976   1 564 369 1 602 885 1 322 922 1 322 922   1 039 438 377 978   7 497 490
 
Mine #7 UG
Tonnes to pad (69%)   241 500 241 500 241 500 241 500 241 500 241 500 241 500 241 500 72 058 2 004 058
   • Head grade (%U)   0.159% 0.159% 0.159% 0.159% 0.159% 0.159% 0.159% 0.159% 0.159% 0.159%
   • Recovery (%U)   70.0% 70.0% 70.0% 70.0% 70.0% 70.0% 70.0% 70.0% 70.0% 70.0%
   • Recoverable tU (30%)   134.7 269.4 269.4 269.4 269.4 269.4 269.4 269.4 215.1 2 235
   • Recoverable lbs U3O8 (30%)   350 185 700 369 700 369 700 369 700 369 700 369 700 369 700 369   559 158 5 811 927
 
Mine #7 UG
Tonnes to mill (31%)   108 500 108 500 108 500 108 500 108 500 108 500 108 500 108 500 23 270 891 270
   • Head grade (%U)   0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630%
   • Recovery (%U)   92.0% 92.0% 92.0% 92.0% 92.0% 92.0% 92.0% 92.0% 92.0% 92.0%
   • Recoverable tU (70%)   628.9 628.9 628.9 628.9 628.9 628.9 628.9 628.9 134.9 5 166
   • Recoverable lbs U3O8 (70%)   1 635 052 1 635 052 1 635 052 1 635 052   1 635 052   1 635 052   1 635 052   1 635 052 350 670   13 431 082
 
Mine #7 UG
Total tonnes mined   350 000 350 000 350 000 350 000 350 000 350 000 350 000 350 000 95 328 2 895 328
   • Average head grade (%U)   0.305% 0.305% 0.305% 0.305% 0.305% 0.305% 0.305% 0.304% 0.274% 0.304%
   • Average recovery (%U)   71.5% 84.1% 84.1% 84.1% 84.1% 84.1% 84.1% 84.4% 133.9% 84.1%
   • Total recoverable tU   764 898 898 898 898 898 898 898 350 7 401
   • Total recoverable lbs U3O8   1 985 236 2 335 421 2 335 421 2 335 421 2 335 421 2 335 421 2 335 421 2 335 421 909 828 19 243 009

Total recovered (tU) 142 693 1 380 1 407 1 407 1 298 1 044 898 898 898 350 10 415
Total recovered (lbs U3O8) 368 466 1 801 178 3 588 121 3 658 342 3 658 342 3 374 859 2 713 398 2 335 421 2 335 421 2 335 421 909 828 27 078 797

The Dornod Uranium Project in Mongolia: Wallace M. Mays