| Table 1: Smith Ranch ISL pilot summary. | ||
|
|
||
|
"Q" sand |
"O" sand |
|
|
Leaching period |
Oct. 1981–Nov. 1984 |
Aug. 1984–Jan. 1991 |
|
Restoration period |
Nov. 1984–May 1986 |
– |
|
Restoration certified |
Aug. 1987 |
– |
|
Pilot flow rate |
378 l/m (100 gpm) |
568 l/m (150 gpm) |
|
5-Spot pattern size |
30 m x 30 m (100 ft x 100 ft) |
36 m x 36 m (120 ft x 120 ft) |
|
Ore depth |
152 m (500 ft) |
230 m (750 ft) |
|
In-place reserves (U3O8) |
61 200 kg (135 000 lbs) |
103 500 kg (228 000 lbs) |
|
Production |
35 400 kg (78 000 lbs) |
96 600 kg (213 000 lbs) |
|
Recovery |
58% |
93% |
|
Fluid processed |
||
|
Pore volume |
11 700 m3 |
45 800 m3 |
|
Pore volume — production |
42 |
45 |
|
Pore volume — restoration |
20 |
– |
|
Days/pore volume |
22 |
56 |
|
|
||
|
|
||