| Table 3: Smith RanchProject costs. | |
|
|
|
|
US$ million |
|
|
Central processing plant |
5.7 |
|
IX recovery plants |
5.8 |
|
Water treatment & disposal |
1.61 |
|
Wellfield drilling & installation |
12.1 |
|
Mobile equipment & administration facility |
2.7 |
|
Pre-production technical expenses |
4.0 |
|
Pre-production administration & overhead |
5.2 |
|
Working capital |
4.1 |
|
Total project cost to design production level |
41.22 |
|
|
|
|
1 Does not include US$1.2 million of project expenditure deferred to 1999. 2 Roads, utilities and some buildings were installed for the underground mine and their costs are not included. |
|
|
|
|