Table 2: Relative overnight costs of nuclear power plants, normalised for a site with one 1000 MWe unit.

1 × 300*

2 × 300*

1 × 650*

2 × 650*

1 × 1000*

2 × 1000

1 × 1350

2 × 1350*

1.82

1.44

1.22

1.0

1.0

0.84

0.87

0.75


* Reactor size in MWe



Nuclear Power: a Competitive Option? : Peter Wilmer and Evelyne Bertel