Table
4: Expected capital cost reductions and influencing factors for Korea
Next Generation Reactor (KNGR) compared with KSNP.
|
|
|
|
|
|
Influencing factor |
Expected cost reduction |
|
Standardised design |
4.9% |
|
Simplified design |
> 4% |
|
Capacity upgrade |
8% |
|
Reduced construction period |
4% |
|
Total capital cost reduction |
> 16.9% |
|
|
|
|
|
|