Table 3: Summary comparison of preliminary cost estimates for plutonium disposition in Russia, prepared by trilateral Russian/French/German (R/F/G) and bilateral Russian/US (R/US) working groups.


  

Preparation & Construction

Operations

Totals


 

Scen.
Var. 1

Base
Case

Scen.
Var. 1

Base
Case

Scen.
Var. 1

Base
Case

(All figures in millions US$, 2000)

(R/F/G)

(R/US)

(R/F/G)

(R/US)

(R/F/G)

(R/US)

             

BOR 60

7.5

7.5

BN600

44.3

117.9

8.4

38.4

52.7

156.3

 

Lifetime extension

14.0

14.0

VVER 1000

81.0

98.6

14.0

66.0

95.0

164.6

 

Lifetime extension

?

7.5

?

7.5

Pilot facilities:

 

Conversion

21.7

21.7

8.7

11.6

30.4

33.3

 

BN/Paket

28.2

28.2

23.2

29.0

51.4

57.2

 

BN/RIAR

11.6

11.6

19.3

19.9

30.9

31.5

 

Lead test assemblies (3)

51.0

?

?

51.0

 

BOR-60 fuel

3.0

3.0

Conversion plant (CHEMOX type)

109.8

88.3

167.2

163.7

277.0

252.0

 

D&D costs (included in above)

17.0

MOX fabrication Plant (DEMOX type)

424.3

269.6

475.2

329.9

899.5

599.5

 

D&D costs (included in above)

70.0

Transportation

33.1

32.0

75.4

84.5

108.5

116.5

Storage

20.0

20.2

88.0

87.5

108.0

107.7

Licensing costs for operators

tbd

?

GAN (regulator)

tbd

tbd

included

tbd

included

Immobilisation

n/a

93.9

n/a

106.1

n/a

200.0

Totals

825.0

782.0

911.4

936.6

1736.4

1718.6

Note: VAT is excluded in both sets of results.


Management of plutonium derived from military programmes