Table
1: Performance and cost data for new baseload power plants in Finland.
|
||||
|
|
||||
|
Nuclear power plant |
Coal-fired condensing power plant |
Combined cycle gas turbine plant |
Peat-fired condensing power plant |
|
|
|
||||
|
Electric power (MWe) |
1250 |
500 |
400 |
150 |
|
Net efficiency rate (%) |
35 |
41 |
55 |
38 |
|
Investment costa (million euros) |
2186 |
407 |
229 |
145 |
|
Investment cost per power output capacitya (euros/kWe) |
1749 |
814 |
572 |
964 |
|
Fuel prices (euros/MWhf) |
1.00 |
4.20 |
10.93 |
5.89 |
|
Fuel costs of electricity production (euros/MWhe) |
2.86 |
10.26 |
19.88 |
15.49 |
|
Annual fixed operation and maintenance costs (percentage of investment) |
1.5 |
2.0 |
1.5 |
2.5 |
|
Variable operation and maintenance costs (euros/MWhe) |
3.41 |
4.92 |
0.31 |
3.10 |
|
Economic lifetime (years) |
40 |
25 |
25 |
20 |
|
Interest rate (%) |
5.0 |
5.0 |
5.0 |
5.0 |
|
Annuity factor (%) |
5.828 |
7.095 |
7.095 |
8.024 |
|
|
||||
|
a
The interest during construction
is included in the investment cost. For the nuclear power plant, the initial
fuel loading is included in the investment.
|
||||
|
|
||||
© copyright The Uranium Institute 2000