Table 1: Plant target specifications

Rated output per module greater than or equal to 165 MWe
Continuous stable power range 40-100%
Load rejection without reactor trip 100%
Construction schedule (nominal) 24 months
Planned outage duration and frequency 30 days every 6 years
Plant availability greater than or equal to 95%
Seismic (peak ground acceleration) 0.4 g
Emergency planning zone < 400 metres

Pebble Bed Modular Reactor The First Generation IV Reactor To Be Constructed