Details

Reactor Type Pressurised Water Reactor (or PWR)
Model CNP-300
Owner Pakistan Atomic Energy Commission
Operator Pakistan Atomic Energy Commission

Timeline

Construction Start Saturday, 28 May 2011
First Criticality Monday, 1 August 2016
First Grid Connection Saturday, 15 October 2016
Commercial Operation Tuesday, 6 December 2016

Specifications

Capacity Net 315 MWe
Capacity Gross 340 MWe
Thermal Capacity 999 MWt
Design Net Capacity 315 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2016 315 1436 344.98 - - - - -
2017 315 8256 2542.08 94.20 93.50 94.00 92.10 92.60
2018 315 7152 2145.22 81.60 80.40 87.50 77.70 85.50
2019 315 7508 2247.57 85.70 85.30 86.80 81.40 84.20
2020 315 7931 2444.19 90.30 89.20 87.30 88.30 85.20
2021 315 8649 2513.45 98.70 99.00 89.60 91.10 86.30
2022 315 8071 2426.79 92.10 89.00 89.50 88.00 86.60

Source: Operating details - IAEA PRIS