Also known as Zaporozhye-3, Zaporizhzhya-3

Details

Reactor Type Pressurized Water Reactor (or PWR)
Model VVER V-320
Owner
Operator

Timeline

Construction Start Thursday, 1 April 1982
First Criticality Thursday, 4 December 1986
First Grid Connection Wednesday, 10 December 1986
Commercial Operation Thursday, 5 March 1987

Specifications

Capacity Net 0 MWe
Capacity Gross 1000 MWe
Thermal Capacity 0 MWt
Design Net Capacity 0 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)