Also known as Zaporozhye-6, Zaporizhzhya-6

Details

Reactor Type Pressurized Water Reactor (or PWR)
Model VVER V-320
Owner
Operator

Timeline

Construction Start Sunday, 1 June 1986
First Criticality Friday, 6 October 1995
First Grid Connection Thursday, 19 October 1995
Commercial Operation Tuesday, 17 September 1996

Specifications

Capacity Net 0 MWe
Capacity Gross 1000 MWe
Thermal Capacity 0 MWt
Design Net Capacity 0 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)