Also known as Zaporozhye-4, Zaporizhzhya-4
Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | VVER V-320 |
| Owner | |
| Operator |
Timeline
| Construction Start | Friday, 1 April 1983 |
|---|---|
| First Criticality | Tuesday, 15 December 1987 |
| First Grid Connection | Friday, 18 December 1987 |
| Commercial Operation | Thursday, 14 April 1988 |
Specifications
| Capacity Net | 0 MWe |
|---|---|
| Capacity Gross | 1000 MWe |
| Thermal Capacity | 0 MWt |
| Design Net Capacity | 0 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|