Also known as Zaporozhye-5, Zaporizhzhya-5

Details

Reactor Type Pressurized Water Reactor (or PWR)
Model VVER V-320
Owner
Operator

Timeline

Construction Start Friday, 1 November 1985
First Criticality Thursday, 20 July 1989
First Grid Connection Monday, 14 August 1989
Commercial Operation Friday, 27 October 1989

Specifications

Capacity Net 0 MWe
Capacity Gross 1000 MWe
Thermal Capacity 0 MWt
Design Net Capacity 0 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)